Tailrace work complete

We have now finished the work widening and strengthening the tailrace, which will be taking a greater flow than it does now. Work on site will stop for a while, until mid-December. This is so that we do not impede … Continue reading

We have now finished the work widening and strengthening the tailrace, which will be taking a greater flow than it does now. Work on site will stop for a while, until mid-December. This is so that we do not impede or disturb the salmon run – work in the tailrace area was permitted, but the next stage will see us working at the weir to install the new sluices and the turbine itself. IMAG0166 IMAG0177 IMAG0336 IMAG0376 IMAG0379