All set to be built by 12 December

We’ve now paid the first deposit to the installers and are going full tilt to build the array before the new Feed-in tariff cutoff point. To see a great video of them at work on a previous site see our Installers page.

This entry was posted in Uncategorized. Bookmark the permalink.