Turbine arrives on site

The turbine is being installed as we speak. Bill comments “The quality of workmanship is impressive. We will have a powerful piece of equipment here – all we need is the river to help us along. With current very low flow conditions we’ll probably only have a ‘window’ for commissioning and then have to shutdown”. Let the rain hold off for a few days while we install and then Autumn can get going properly!

Avatar photo

About Jon Halle

Jon is a co-founder of the Big Solar Co-op and of Sharenergy Co-operative
This entry was posted in Info. Bookmark the permalink.